Nauhria Site Icon

Technical

BIM Modelling in Reinforcing

Nauhria Reinfrocing uses BIM technology to facilitate better designs and greater interaction with the client from the initial design stage to erection stage. 

Our BIM model generates valuable data for contractors for better project, coordination, and communication, enabling easy alterations to the design and construction stages from the various project members.

For example, here is a preliminary BIM model created for a major Mount Wellington project to present a full picture of the project, including:

  • 3D views of individual elements
  • Reinforcing clash detections with components
  • Crane safe working Load check with Precast elements
  • Identifying overweight and oversize elements.
  • Simulation of erection sequences. 
a 3D view of pile cap, showing the bars
3D models of the Pile Cap, highlighting each region.
Another example 3D model of an airport taxiway

3D models of the Pile Cap, highlighting each region.